top of page
![League](https://static.wixstatic.com/media/84911f_7d1761ed5df045eeadf8e093f2ad1d2b~mv2.jpg/v1/fill/w_163,h_98,al_c,q_90,enc_auto/Center%20Ice%20Archive.jpg)
![Huntinton Center](https://static.wixstatic.com/media/84911f_cbdb1bcb59fe417e8604031823102d0c~mv2.jpg/v1/fill/w_127,h_85,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/84911f_cbdb1bcb59fe417e8604031823102d0c~mv2.jpg)
Huntinton Center
Credit: Destination Toledo
![Huntinton Center Interior](https://static.wixstatic.com/media/84911f_89c2c5803b0f4c8abb4d786e8b0b9dec~mv2.jpg/v1/fill/w_147,h_77,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/84911f_89c2c5803b0f4c8abb4d786e8b0b9dec~mv2.jpg)
Huntinton Center Interior
Credit: Scolins Sports Venues Visited
![Huntinton Center Interior](https://static.wixstatic.com/media/84911f_f4fea6626f154bf5abc1b734adbc8b36~mv2.jpg/v1/fill/w_147,h_98,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/84911f_f4fea6626f154bf5abc1b734adbc8b36~mv2.jpg)
Huntinton Center Interior
Credit: Ohio.org
![Huntinton Center](https://static.wixstatic.com/media/84911f_cbdb1bcb59fe417e8604031823102d0c~mv2.jpg/v1/fill/w_127,h_85,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/84911f_cbdb1bcb59fe417e8604031823102d0c~mv2.jpg)
Huntinton Center
Credit: Destination Toledo
1/3
Huntington Center
Toledo, OH USA
Rink Dimensions (feet)
200x85
The Huntington Center is an 8,000-seat multi-purpose arena in downtown Toledo, Ohio. It was completed in 2009 and cost $105 million to build. It replaced the Toledo Sports Arena, which has since been demolished.
Toledo Walleye 2019
Regular Season, Playoffs
Center Ice Logo and Rink Layout
Additional Layouts
Related Rinks
HUNTINGTON CENTER
Credit: Huntington Center
Arena
The Huntington Center is an 8,000-seat multi-purpose arena in downtown Toledo, Ohio. It was completed in 2009 and cost $105 million to build. It replaced the Toledo Sports Arena, which has since been demolished.
Map
Photos
Comments
Couldn’t Load Comments
It looks like there was a technical problem. Try reconnecting or refreshing the page.
bottom of page