top of page
15th Anniversary Nav Logo.png
  • Threads
  • Instagram
  • Bluesky
  • Email
League
Gatineau Olympiques 2021 (1st)
Gatineau Olympiques 2021 (2nd)

2021

The Centre Robert-Guertin was used as an emergency shelter during the pandemic, forcing the team to move to Aréna Baribeau for what would have been the final season at their home arena. They played the first two games of the regular season here before moving to another rink. 

Graphics

Pregame Rink.png
PostGameRink.png
Gatineau Olympiques 2021 (1st)
Gatineau Olympiques 2021 (1st)

Gatineau Olympiques 2020

2020

League

Aréna Baribeau

Gatineau, QC Canada

Rink Dimensions

200x85 Feet

This arena was built in 1970 and closed in 2022.

Faceoff CIA.png

TheFaceoff.net ©2026 

Graphics on this site may not be sold or used for profit. ​Use of graphics for personal use only is permitted with credit and link back to thefaceoff.net.

Gatineau Olympiques 2021 (1st)
Regular Season
Center Ice Logo and Rink Layout

Additional Layouts

Related Rinks

Arena

Aréna Baribeau

This arena was built in 1970 and closed in 2022.

1-1 Placeholder.png

Gatineau Olympiques 2021 (2nd)

1-1 Placeholder.png

Current Season

1-1 Placeholder.png

Gatineau Olympiques 2020

Photos
Comments
Share Your ThoughtsBe the first to write a comment.
Footer 15th.png
  • Threads
  • Instagram
  • Bluesky
  • Email

Copyright© 2011-2026 TheFaceoff.net - All rights reserved. All logos are property of their respective teams and brands. This site is for historical and research purposes only. Graphics on this site may not be sold or used for profit. ​Use of graphics for personal use only is permitted with credit and link back to thefaceoff.net.  

bottom of page