top of page
TheFaceoff Header Dec2003.png
  • Threads
  • Instagram
  • Bluesky
  • Email

Next Rink

Toledo Walleye 2024
League
League

Download Graphics

3D Icon.png
Pre-GameDownload.png
Post-GameDownload.png

Wallpaper

Toledo Walleye 2023
Toledo Walleye 2023

Center Ice

Toledo Walleye 2023

Previous Rink

Toledo Walleye 2022
League

Huntington Center

Toledo, OH USA

Rink Dimensions (feet)

200x85

The Huntington Center is an 8,000-seat multi-purpose arena in downtown Toledo, Ohio. It was completed in 2009 and cost $105 million to build. It replaced the Toledo Sports Arena, which has since been demolished.

Toledo Walleye 2023
Regular Season, Playoffs
Center Ice Logo and Rink Layout

Additional Layouts

Related Rinks

HUNTINGTON CENTER

Credit: Huntington Center

Arena

The Huntington Center is an 8,000-seat multi-purpose arena in downtown Toledo, Ohio. It was completed in 2009 and cost $105 million to build. It replaced the Toledo Sports Arena, which has since been demolished.

1-1 Placeholder.png

Toledo Walleye 2024

1-1 Placeholder.png

Current Season

1-1 Placeholder.png

Toledo Walleye 2022

Map
Photos
Comments
Fikirlerinizi Paylaşınİlk yorumu siz yazın.
F Logo white.png
  • Threads
  • Instagram
  • Bluesky
  • Email

Copyright© 2011-2025 TheFaceoff.net - All rights reserved. All logos are property of their respective teams and brands. This site is for historical and research purposes only. Graphics on this site may not be sold or used for profit. ​Use of graphics for personal use only is permitted with credit and link back to thefaceoff.net.  

bottom of page